Probable maximum loss (PML) and estimated maximum loss (EML)
Estimate of the largest loss an insurer or reinsurer can reasonably expect on a risk or a portfolio under a realistic adverse scenario, short of the absolute worst case.
Probable maximum loss (PML) is the largest loss a book or a single risk is expected to produce under adverse but realistic conditions, short of the worst case. The term carries two meanings, and a submission that quotes it rarely says which. For cat modelers it is a quantile of the annual loss distribution, read off the exceedance probability curve at a return period T, PMLT = VaR at 1 − 1/T. The 1-in-200 PML is the 99.5% quantile and the 1-in-250 the 99.6%. Article 101 of Solvency II calibrates the SCR to a one-year 99.5% VaR, which is why the 200-year figure is quoted most, with 100 and 250 alongside; a PML read off the OEP curve (largest single event) and one read off the AEP curve (annual aggregate) are different numbers for the same return period. For property underwriters the PML, or EML in UK and European usage, is a deterministic site figure, the loss from a credible scenario such as fire spreading up to the next firewall, stated as a percentage of total insured value.
US engineering practice splits it further. The PML assumes one protection, typically the sprinklers, is impaired, while the maximum foreseeable loss (MFL) assumes every active protection fails and only passive barriers hold. Maximum possible loss ignores probability altogether. The portfolio quantile drives the cat program, its retention and exhaustion point, and the capital behind it; the site EML sizes the net line and the facultative bought above it. Overstate it and the buyer pays for limit that will not be reached. Understate it and the loss runs through the top of the program. On August 12, 1953, a welding spark set off the fire that destroyed General Motors' Hydra-Matic plant in Livonia, Michigan, at a cost of at least $50 million, the maximum possible loss made real once the protections failed. Cyber PMLs are portfolio quantiles too, but the dependency behind them shifts, as the CrowdStrike update of July 19, 2024, showed when 8.5 million Windows machines went down together.
Take a chemical plant in Rotterdam with €500 million of total insured value. The underwriter's scenario is an explosion followed by a fire across half the site, and the EML is set at 60%, or 0.6 × 500 = 300 million. The insurer keeps a net line of 20 million, 6.7% of the EML (20 / 300), and places the other 280 million in facultative with five reinsurers, 56 million each on equal shares. The same plant's MFL, with every sprinkler out, could reach the full 500 million.
- Directive 2009/138/EC of November 25, 2009 (Solvency II), Article 101
- FM Global, Property Loss Prevention Data Sheet 1-22, Maximum Foreseeable Loss
- John S. McGuinness, "Is 'Probable Maximum Loss' (PML) a Useful Concept?", Proceedings of the Casualty Actuarial Society, vol. 56, 1969