Three graded wordings that set how far cover on a construction project extends to damage arising from a design or workmanship defect.
An undersized beam fails during construction and brings down a sound slab. The contractors' all risks policy covers accidental damage, not the cost of building the works properly, and the London Engineering Group's three defects clauses decide where the line falls between the two. They run from the narrowest cover to the broadest.
LEG 1/96, the outright defects exclusion, excludes loss or damage due to defects of material, workmanship, design, plan or specification. Neither the beam nor the slab is covered.
LEG 2/96, the consequences wording, excludes the cost of replacing, repairing or rectifying the defective property, measured as the cost that would have been incurred had the rectification been put in hand immediately before the damage. Resulting damage to other property is covered. The beam's rectification stays with the insured, the slab is paid. The test is hypothetical and engineers argue over what it would have cost to fix the beam the day before it failed.
LEG 3/06, the improvement wording, excludes only the cost of improving the original material, workmanship, design, plan or specification. The beam is rebuilt at the insurer's expense; only the upgrade to a corrected design stays with the insured.
LEG 2 and LEG 3 share one sentence that matters a great deal in practice. Property is not regarded as damaged solely because a defect exists in it. A defect found on inspection, before anything gives way, is not a claim.
LEG 2 is the usual market wording; LEG 3 is negotiated on large projects at an additional premium, so the clause choice shows up in both rate and result. The older DE clauses (DE1 to DE5) do the same work; LEG 2 is commonly compared with DE4 and LEG 3 with DE5, though the words differ and case law on one does not transfer automatically. The first appellate reading of DE5 came from the Court of Appeal of England and Wales on December 16, 2024 (Sky v Riverstone), and lawyers read it closely for LEG 3.
Take the beam case with illustrative figures. Rebuilding the beam as it was designed costs $2 million, strengthening it to a corrected design $0.6 million more, and the slab it destroyed $6 million, a loss of 2 + 0.6 + 6 = $8.6 million. Fixing the beam the day before it failed, propped and rebuilt to the corrected design, would have cost 2.6 million. Under LEG 1 nothing is paid. Under LEG 2 the 2.6 million of rectification is excluded and 8.6 − 2.6 = 6 million is paid. Under LEG 3 only the 0.6 million improvement is excluded and 8.6 − 0.6 = 8 million is paid. The gap between LEG 2 and LEG 3 is 2 million, 23% of the loss.
- London Engineering Group, LEG 1/96 (outright defects exclusion), LEG 2/96 ("consequences" defects wording) and LEG 3/06 ("improvement" defects wording)
- Court of Appeal of England and Wales, Sky UK Ltd v Riverstone Managing Agency Ltd, December 16, 2024 (DE5 clause)
LEG 1, LEG 2, LEG 3, London Engineering Group, defects exclusion
Follow the research
One letter a week. First, the week's underwriting note when one is published, with its dated, reasoned decision. Then what the observatory published on cyber, artificial intelligence, insurance and reinsurance. No account, no tracking.
No spam, one-click unsubscribe, no data ever sold.