Skip to content

Renewable energy insurance

Cover for generating assets whose risk shifts from construction to operation, and whose failures are often serial rather than accidental.

Definition

On July 13, 2024, a blade failed at the Vineyard Wind offshore farm off Massachusetts, and the federal regulator suspended construction and generation pending investigation: one component stopped the whole site. A wind or solar farm concentrates high value in standardized equipment, installed in hostile environments and operated without permanent human presence. The risk changes character in three stages. During construction the major exposure is the transport and lifting of oversized components, offshore with narrow weather windows and scarce specialist vessels, so an incident mostly means delay, and an advance loss of profits claim. Construction is written on construction all risks or erection all risks, with delay in start-up behind it; design defects are bought back under the London Engineering Group clauses, LEG 2 or LEG 3, which decide whether the faulty part itself is paid or only the damage it causes. In operation, most losses come from hail on solar farms, lightning, and blade and gearbox failures; those last are less accidents than serial defects, which is why the serial loss clause carries so much weight. Finally, the technology moves faster than the loss history builds up. Each generation of turbines is bigger than the one insurers have data on, so the underwriter is always pricing a machine it has never seen grow old.

Example

The failure of a turbine blade at the Vineyard Wind offshore farm off Massachusetts on July 13, 2024 scattered composite debris on Nantucket beaches and led the US federal regulator to suspend construction and generation at the site pending investigation.

The case, drawn
From the build to the batchWHERE A WIND OR SOLAR FARM'S RISK MOVESBUILDout-of-gauge transport and lifting,at sea, in narrow weather windows:an incident mostly costs delayCAR or EAR, then DSUDESIGNis the faulty part itself paid,or only what it breaks?LEG 2 or LEG 3OPERATIONhail, lightning, blades andgearboxes giving way, more oftenin batches than one at a timethe serial loss clause13.07.2024Vineyard Wind, Massachusetts:a blade breaks, debris onNantucket's beachesINQUIRYthe federal regulator haltsconstruction and production:one component stops the farmEach generation of turbines is bigger thanthe one the insurer has a loss history on.
SourcesOn July 13, 2024, a blade failed at the Vineyard Wind offshore farm, off Massachusetts, and debris washed up on Nantucket's beaches. The US federal regulator suspended construction and production during the inquiry. CAR, EAR, DSU, LEG 2 and LEG 3 (London Engineering Group) and the serial loss clause come from the entry, which says what each phase puts at stake.
Read next
Related terms
Related articles
Also known as

renewable energy insurance, wind farm insurance, solar PV insurance, offshore wind insurance, renewables insurance, solar farm insurance, wind turbine insurance, renewable energy project insurance, alternative energy insurance, insurance for renewable energy, green energy insurance, renewable energy assurance

Stay informed

Follow the research

One letter a week. First, the week's underwriting note when one is published, with its dated, reasoned decision. Then what the observatory published on cyber, artificial intelligence, insurance and reinsurance. No account, no tracking.

No spam, one-click unsubscribe, no data ever sold.